[ExI] new heavy lifter
Stefano Vaj
stefano.vaj at gmail.com
Thu Apr 7 11:48:15 UTC 2011
2011/4/6 spike <spike66 at att.net>:
> Back in 1979, a lot of the smart guys realized the existing thermal
> protection system would need to be redone. I knew this because I was
> acquainted with many of these smart guys, including my girlfriend’s father.
> He had crystal foresight: NASA would end up redoing the tiles, payload
> capacity would go way down, turnaround time would go way up, costs would go
> thru an already very high roof. All this was well known by summer of 1979,
> two years before first flight.
So, what should they have done, in your opinion?
--
Stefano Vaj
More information about the extropy-chat
mailing list