[extropy-chat] Fill it in a pave it over
Dan Clemmensen
dgc at cox.net
Tue Sep 6 00:23:51 UTC 2005
What would the logistics be to just fill New Orleans in with gravel and
build on top? Get the level higher than the maximum level of Lake
Ponchartrain. Gravel would ship by barge from the entire Mississippi basin.
The max depth is quoted at 20 feet. The city was 80% flooded to an
average depth of 6 feet I think. Is that more volume or less volume than
the Hoover Dam? Yes this approach would require writing off the existing
infrastructure in most of New Orleans (roads, sewers, utilities.) But
it's often cheaper to start from scratch than it is to repair old
infrastructure.
More information about the extropy-chat
mailing list